Client Need:
Three major components were needed to bring the designer's vision to fruition: paving for the entrance to NCWCD's new headquarters, a unique lobby floor, and a natural rock feature that created a microcosm of the natural water system of northern Colorado.
Solution:
CHI offers all of the services required and had the experience to work with the designer to make each outstanding element of the design a reality.
Results:
Custom colored and finished concrete greets visitors at the new headquarters and campus. A reactive stain floor with a swirl flourish of color distinguishes the lobby and continues up the staircase. Natural rock and flagstone were used to create the amazing water feature. Colorado Hardscapes placed all of the rock and completed all of the mechanical work.
Awards:
2003 Bomanite® Corporation Worldwide Best Commercial Project
|
 |
 |
|
|
|
 |
|
 |
 |
 |
General Contractor:
FCI Constructors
|
 |
 |
Designer:
BHA Design
|
 |
 |
Completed:
October 2003
|
 |
 |
 |