After 5 years of construction, Monarch Black Hawk Casino finally wrapped up its final touches. After completing the building’s major renovations, it opened up to the public in November 2020. The casino doubled its size to provide expanded amenities to its customers. What better way to welcome people to the luxury casino than to provide […]
Charles Schwab Lone Tree
The Charles Schwab Lone Tree Campus phase #3 project began to transpire back in 2018. Decorative concrete was placed on the main entry into the building and surrounding drive areas. The general contractor, Mortenson Company worked with Colorado Hardscapes to install specifically designed Bomanite imprinted concrete (stamped). Moreover, working with Schwab’s designers and Davis Architects, […]
Gaylord of the Rockies
Colorado Hardscapes was proud to be apart of the Gaylord of the Rockies Hotel and Convention Center located in Aurora, CO. This job included both interior and exterior work along with several pool decks.
Johnson Habitat Park
Johnson Habitat Park is part of a larger vision of restoring the riverfront along the South Platte River. DHM Design created a landscape design which both educated and inspired park-goers to learn about Colorado, nature and the river. Therefore, they included many unique features that required creative constructibility problem-solving. Colorado Hardscapes worked with the team […]